Collapse Week 3 Day 1
as we are plotting the show blind the remainder of the time we have in college will be spent plotting the songs that are going to be used in the show. We started off this process without the knowledge of patching for our generic fixtures. This was fine for when we were doing the overture for the show but as we were now needing to get light to hit certain parts of the stage this was required. Due to us not being able to patch on the dimmers in the Arts House I will be soft patching the fixtures in the desk which does allow us to group the different types of fixtures together as the designer has included warm, cool and open white in all front side and back groups.
during the plotting we were able to finish the jesus christ superstar plotting excluding solos and start on the footloose plotting.